Downtown Auburn Progress August 2022
On-site work continues on Downtown Auburn's Municipal Complex and infrastructure for the area. Here's the latest from BM&K Construction & Engineering. Regular updates will be provided as the project progresses.
Every step is taken to ensure compliance with the plans and specifications. This includes but is not limited to:
- Soil density testing
- Concrete and materials testing
- Footing and reinforcing inspections
- Pavement testing
In addition to the City of Auburn staff and BM&K supervision, Contour Engineering has been on site to inspect utility installation and earthwork conditions, as well as Onsite Monitoring conducting weekly erosion control inspections.
Recently Completed Activities
Site:
Building:
City Hall from above
Current Activities
Site:
- Sleeve installation
- Curb installation
- Asphalt paving
- Dry utilities
Building:
- Brick and stone installation
- Rough in electrical and mechanical
- 2nd floor and Exterior Insulation and Finish Systems (EIFS) framing
- Sprinkler piping installation
Upcoming Activities
Site:
- Parking lot and alley paving
- Final platting of lots
- Dumpster enclosure
Building:
- Roofing
- Cupola installation
- EIFS and thin brick